The project involved the Detailed Engineering Design (DED) of the expansion the existing Boil-off Gas Compressor in the existing NLNG facility at Finima in Bonny Island.

Title: New Boil-Off Gas (BOG) Compressor Project
Client: NLNG
Location: Bonny Island
Date: 2021
The project involved the Detailed Engineering Design (DED) of the expansion the existing Boil-off Gas Compressor in the existing NLNG facility at Finima in Bonny Island.

ALARP (As Low As Reasonably Practicable)
The ALARP workshop for the New BOG Compressor Project was performed to demonstrate that risk reduction measures had been identified for risks (Individual or societal) which fall within the ALARP region in the Risk Tolerability Criteria while carrying out Quantitative Risk Assessment.
⦁ ALARP Workshop Spreadsheet
⦁ A draft containing the outcome of the workshop.
⦁ HEMP (Hazard and Effect Management Process) Closeout Report.