Optimera is charged with the responsibility to construct Natural Gas Infrastructure and distribute Natural Gas to End-Users off takers with the zone.The project shall comprise of proposed construction of an approximately 18” x 8km tie-in at the existing 20” Dangote Escravos Lagos Pipeline (ELP), (estimate distance) to the proposed CITY GATE – Custody Transfer Metering Station(CGS) location at Lagos State Free Zone, from where natural gas will be distributed within the free zone to different customers
Risk and Safety
- Fire Risk Analysis
- Quantitative Risk Analysis
- Explosion Risk Analysis
- Building Risk Assessment
- Emergency Evacuation Rescue Analysis
- Emergency Systems Survivability Analysis
- Flare Radiation, Dispersion and Noise
- Ship Collision Study
- Dropped Object Study
- Manual of Permitted Operations (MOPO)
- Fire and Gas Mapping
- Design/Operations Performance Standard
Risk and Safety
- Written Scheme of Examination
- Acoustic-Induced Vibration Analysis
- Pre-Startup Safety Review
- Noise Study
- SIL Verification
- Functional Safety Plan
- HSE CASE / Safety Case / HSEIA
- Risk Based Inspection
CFD Modelling
Reliability Studies
Fire Protection Design