SPDC JV with Shell as operator of OMLs 16, 17, 21, 22, 27 and 28 on behalf of the joint venture partners, embarked on the Gbaran Phase 3B – Uzu with CPF Upgrade project which aims to develop 815Bscf (UR) of gas and 11.5MMbbls (UR) of oil & condensate to meet SPDC’s commitment to sustain NLNG gas supply obligation and grow oil production. The project scope includes infill drilling involving 5 NAG wells and 1 oil well, flowlines, test line and a NAG bulk line from the Uzu field to the Gbaran CPF.
The facility upgrade scope at the Gbaran Central Processing Facility include debottlenecking of the existing 2 dehydration trains to accommodate additional 200MMscfd from the EPC for Gbaran Phase 3b – UZU with CPF Upgrade Project. All six wells to be drilled as part of this development will be from two existing locations – Zarama 15 and Zarama 08-11 NAG well locations.