Project Brief:
SEPLAT identified opportunity in Sapele Shallow Field for development as part of Sapele OML 41 producing field. The overall objective of the project is to execute a technical solution that will enable
the production of oil from new wells to be drilled by providing the required lift gas and other surface facilities.
The scope of work covered was the Front-End Engineering Design to develop the basic engineering deliverables that formed the groundwork for the detailed engineering phase. It also provided sufficient data and documents to facilitate the procurement of identified long lead items and other materials required for the successful installation and commissioning of equipment / packages and other support facilities.