The Kalaekule (KC) offshore production facility comprises of two drilling platforms (KCDP-A and KCDP-B), one production platform (KCPP-A) and one flare jacket (KCVJ-A). The objective of this project is to ensure remedial work scopes for making the facility ready for safe operations are executed before production of the first oil in Kalaekule field.
Chemical injection shall be required regularly throughout Kalaekule Production Operations. As a minimum, the chemicals to be used include (but not limited to):
- Demulsifier
- Scale
- Corrosion Inhibitor
- Defoamer
- Wax Inhibitor