OML 100 Flare Reduction Project is aimed at gas flare reduction. This project entails routing piping and new process equipment which may be negatively impacted upon during hoisting activities. The new PSV’s, Flare ignition System and other new equipment to be installed will be under the crane radius during hoisting activities and should be adequately protected from impact of falling loads, necessitating a Dropped Object Safety Study.
Risk and Safety
- Fire Risk Analysis
- Quantitative Risk Analysis
- Explosion Risk Analysis
- Building Risk Assessment
- Emergency Evacuation Rescue Analysis
- Emergency Systems Survivability Analysis
- Flare Radiation, Dispersion and Noise
- Ship Collision Study
- Dropped Object Study
- Manual of Permitted Operations (MOPO)
- Fire and Gas Mapping
- Design/Operations Performance Standard
Risk and Safety
- Written Scheme of Examination
- Acoustic-Induced Vibration Analysis
- Pre-Startup Safety Review
- Noise Study
- SIL Verification
- Functional Safety Plan
- HSE CASE / Safety Case / HSEIA
- Risk Based Inspection
CFD Modelling
Reliability Studies
Fire Protection Design