New Boil-Off Gas Compressor Project – SAFOP

Project Details

Title: New Boil-Off Gas (BOG) Compressor Project

Client: NLNG

Location: Bonny Island

Date: 2021

description

The project involved the Detailed Engineering Design (DED) of the expansion the existing Boil-off Gas Compressor in the existing NLNG facility at Finima in Bonny Island.

SAFOP (Electrical System Safety and Operability)
The SAFOP review was performed to review the electrical installation of the New BOG Compressor Project together with the interfaces with the existing installations as follows:
⦁ Identify major hazards and hazardous events with the potential to affect people, environment, assets, and reputation of the company.
⦁ Identify any operability concern that are inherent to the detailed design.
⦁ Identify causes/threats, consequences, and safety measures that are in place or to be implemented to eliminate or reduce the risk to persons, assets or environment to As Low as Reasonably Practicable (ALARP) arising from those hazards.
⦁ Identify any actions required to eliminate, reduce, or mitigate the risk from the hazards identified.

⦁ SYSOP Register.
⦁ SAFAN Register.
⦁ OPTAN Register.
⦁ SAFOP Report.