Projects

Cutting across various engineering disciplines, PetroPlat Energy Limited has engaged in several projects within the industry. Below are some of the projects we have undertaken. As an engineering services company, we are known for timely delivery of quality services to all our clients.

Extracts of Projects by PetroPlat

# Date Client Name Project Title / Details Status
1 2024 IESL DORIS Group / Shell Exploration and Production Company (SNEPCO) HA FEED Development Project Ongoing
2 2024 IESL DORIS Group / Shell Exploration and Production Company (SNEPCO) HA FEED Development Project Ongoing
3 2024 IESL DORIS Group / Shell Exploration and Production Company (SNEPCO) HA FEED Development Project Ongoing
4 2024 Aveon Offshore Limited / Seplat Energy PLC Sapele Propane / LPG Storage and Loading Facility DED Project Completed
5 2024 Aveon Offshore Limited ASME U&R Certificates Renewal Project Completed
6 2024 Aveon Offshore Limited / Anoh Gas Processing Company Limited EPCI – Tie-In Connection for Gas Off-takers – ANOH Gas Plant Project AGPP Completed
7 2024 Aveon Offshore Limited / Heritage Energy Operational Services Ltd HEOSL Produced Water Treatment Project – Phase I Completed
8 2024 Murphy Oil – PetroVietnam LDV-A-PP Dynamic Simulation Model Ongoing
9 2024 Aveon Offshore Limited / ND Western Utorogu Amine Plant Project Completed
10 2024 Aveon Offshore Limited / Seflam SGL / Nigerian Gas Company NGC Rehabilitation / Upgrade of Sapele Metering Station Ongoing
11 2024 Bureau Veritas / North Oil Company EPCIC11 – RUYA BATCH 1 WHPs – Ongoing
12 2024 DeltaAfrik Engineering LTD / Aradel Holdings DED for Crude Oil Export Pipeline Completed
13 2024 Qatar Energy / Bureau Veritas Qatar EPCIC13 – B LOCATION PROCESS PLATFORM AND FLARE Ongoing
14 2024 Shell Petroleum Development Company SPDC Southern Swamp Associated Gas Project SSAGP – CEIP. Ongoing
15 2024 Aveon Offshore Limited / Seplat Energy PLC Oben Gas Plant Flare Out Project Completed
16 2023 Aveon Nigeria Limited / Chevron Nigeria Limited Produced Water Disposal Project Completed
17 2024 Aveon Offshore Limited / Seflam SGL / Shell Petroleum Development Company SPDC Detail Mechanical Design for 2Nos. Pig Launcher, 2Nos. Pig Receiver, & 1Nos. Closed Drain. Ongoing
18 2023 Bureau Veritas FPSO Drain Drum ignition Study Completed
19 2023 Aveon Offshore Limited / Tecnimont Port Harcourt Refining (PHRC) Company Rehabilitation Project Completed
20 2023 Aveon Offshore Limited / Star Deep Water Petroleum LTD Agbami FPSO Project Completed
21 2023 Aveon Offshore Limited / Chevron Nigeria Limited EGP Degasser Flares-Out Project Completed
22 2023 Aveon Offshore Limited / TotalEnergies OML 58 / OBAGI OB122 WHCP Completed
23 2023 Bureau Veritas / Vietsovpetro Joint Venture (VSP) Block 09-2/09 Field Development KNT & KTN Project Completed
24 2023 Bureau Veritas / PTSC M&C / North Oil Company Block 5 – AL SHAHEEN FIELD Development – EPCI5 Completed
25 2023 Falcon Corporation Limited DED Validation for 15KMT LPG Bulk Gas Storage Facility & Jetty Project Completed
26 2022 Chevron Nigeria Limited Escravos Gas Plant (EGP) Degasser Flares-out Project Completed
27 2023 Aveon Offshore Ltd / TotalEnergies ODP1 Discharge Scrubber Completed
28 2023 Optimera LFZ Development of Lagos Free Zone Gas Pipeline & City Gate Station Completed
29 2023 TotalEnergies OML 100 Flare Reduction Project Completed
30 2022 Aveon Offshore Limited Preliminary Design for Crude Oil Storage Tanks Completed
31 2022 Nigerian LNG Limited NLNG Nitrogen Enhancement Project Completed
32 2022 Bureau Veritas / PTSC M&C / North Oil Company Block 5 – AL SHAHEEN FIELD Development Project Completed
33 TBD Total / IESL Doris OML 100 Flare Reduction Project – CFD Modelling Ongoing
34 TBD Total / IESL Doris OML100 Flare Reduction Project – Dropped Object Study Ongoing
35 TBD WAEP / Aveon Kalaekule Re-entry Project Ongoing
36 2021 Q4 ENTREPOSE DBN F&G Mapping Study for NLNG – BOG Compressor Project Ongoing
37 2021 Q4 WAEP/Aveon Kalaekule Re-entry Project – Chemical Injection Skid (Bid Support) Completed
38 2021 Q4 WAEP/Aveon Kalaekule Re-entry Project – KCPPA Manifold Basic Design Scope (Bid Support) Completed
39 TBD NETCO Total Ikike Surf Project Ongoing
40 2021 Q4 Total / IESL Doris OML 100 Flare Reduction Project – Discharge Scrubber Vessel Completed
41 2021 Q3 NLNG NLNG Train 7 Project Completed
42 2021 Q3 NETCO Bonga North Tranche-1 Feed Project Completed
43 2021 Q3 NLNG New Boil-Off Gas Compressor Project – SIL/LOPA Completed
44 2021 Q2 NLNG New Boil-Off Gas Compressor Project – HAZOP Completed
45 2021 Q2 NLNG New Boil-Off Gas Compressor Project -SAFOP Completed
46 2021 Q2 NLNG NLNG Train 7 Project – Asset Permanent Housing Tank Completed
47 2021 Q1 NLNG New Boil-Off Gas Compressor Project – ALARP Completed
48 2021 Q1 NLNG New Boil-Off Gas Compressor Project Completed
49 2021 Q1 Shell Soku NAG Compression Facilities Completed
50 2020 Q4 Shell/Aveon Fabrication Engineering Design for Pressure Vessel for HI Project, for Saipem RFQ to Aveon Completed
51 2020 Q4 Shell HI Development Project – Safety Studies Completed
52 2020 Q3 Total IkIke SURF Project – Risk Reduction Workshop Completed
53 2020 Q3 MPN BOP SPM Integrity Restoration Project Completed
54 2020 Q3 NETCO Jisike FS Debottlenecking & Gas- Lift Compression Station Project Completed
55 2020 Q2 Seplat/Aveon Sapele FOD–Gaslift Compression Station FEED Project Completed
56 2019 Q4 Shell Gbaran Phase 3B – Uzu with CPF Upgrade Project Completed
57 2019 Q4 NPDC Okpoho-Okono 12″ and 6″ Subsea Flexible Pipelines Project Completed
58 2019 Q4 NPDC Okpoho-Okono 12″ and 6″ Subsea Flexible Pipelines Project Completed
59 2019 Q4 Total Ikike SURF Project HAZID Workshop Completed
60 2019 Q4 Total
Bollard pull calculation and Tow Plan procedure for JASCON77 Stability Analysis and Deck Strength Check for JASCON77
Completed
61 2019 Q3 Chevron Escravos Tank Farm Fire Network Study Completed
62 2019 Q3 Total Stability Analysis and Deck Strength for “ENL-TRIUMPH-2” Completed
63 2019 Q1 NPDC Okpoho-Okono 12″ and 6″ Subsea Flexible Pipelines Project Completed
64 2019 Q1 Total Tow plan procedure for Jascon & Stability analysis & deck strength check Completed
65 2019 Q1 Total Stability analysis and deck strength check for JMC3004 Completed
66 2018 Q4 AMNI Subsea Umbilical Lay Analysis Completed
67 2018 Q4 Total Stability Analysis and Deck Strength Check for JMC3004 (AP05 Jumper) Completed