The Kalaekule (KC) offshore production facility comprises of two drilling platforms (KCDP-A and KCDP-B), one production platform (KCPP-A) and one flare jacket (KCVJ-A). The objective of this project is to ensure remedial work scopes for making KCDP-A & KCDP-B ready for safe operations are executed before production of the first oil in Kalaekule field.
Risk and Safety
- Fire Risk Analysis
- Quantitative Risk Analysis
- Explosion Risk Analysis
- Building Risk Assessment
- Emergency Evacuation Rescue Analysis
- Emergency Systems Survivability Analysis
- Flare Radiation, Dispersion and Noise
- Ship Collision Study
- Dropped Object Study
- Manual of Permitted Operations (MOPO)
- Fire and Gas Mapping
- Design/Operations Performance Standard
Risk and Safety
- Written Scheme of Examination
- Acoustic-Induced Vibration Analysis
- Pre-Startup Safety Review
- Noise Study
- SIL Verification
- Functional Safety Plan
- HSE CASE / Safety Case / HSEIA
- Risk Based Inspection
CFD Modelling
Reliability Studies
Fire Protection Design